Industrial components are the brackets, flanges, mounts and housings that keep plant and machinery running. They locate, support and transmit load. A small dimensional error can stop the plant they serve.
Hole positions and tolerances are held to the drawing, and the material is chosen for the duty cycle. Every part is checked against the drawing before it leaves, and repeat orders are made to the same master.
What we make
- Brackets & mounts — for equipment and services
- Flanges & plates — bolted connections
- Housings & guards — enclosures for plant
- Wear parts — liners, strips and skid plates
- Repeat production — the same part, every time
Specifications
| Material | Mild steel · stainless · aluminium |
| Process | Laser · punch · fold · weld |
| Tolerance | ±0.2mm on machined-hole positions |
| Batch | One-off through production runs |
Typical jobs
- Conveyor brackets
- Bearing housings
- Motor mounts
- Guard panels
- Wear liners
How we treat them
Repeat industrial work starts with a drawing and a first-off sample. Once the sample is approved, it becomes the reference for every future run — so a bracket ordered in March fits the machine the same as the one ordered in November.
First-off approved
First-off approval is standard on repeat work. The approved sample is kept and every subsequent batch is checked against it.
Common question
Can you hold stock and supply in batches?
Yes. We can fabricate in batches and release them to your schedule, so you are not storing steel you do not need yet.
What the drawing needs
- The drawing with hole positions and tolerances
- Material grade and any heat treatment or coating
- Quantity — one-off or repeat supply
- The assembly the part mates with, if tolerances are critical
Related work
Also asked
Can you machine to tighter tolerances?
We hold ±0.2mm on cut profiles as standard. For tighter fits we coordinate machining with partners — tell us the mating part and we will advise the practical tolerance.
Ready to start a job?
Send a drawing and we will come back with pricing and a lead time.