Quality in fabrication is a sequence of checks performed in the right order. The workshop works to one rule: the part is either to the drawing, or it is not finished. Every job passes through the same inspection points, from material receipt to dispatch.

Because cutting, forming, welding and finishing happen in one facility, dimensional problems are found at the bench, not on site.

Inspection points

  • Material receipt. Grade and thickness are checked against the drawing before cutting. Mill certificates are kept and can be supplied with the job.
  • First-off inspection. The first part of every run is measured against the drawing before the balance is produced.
  • In-process checks. Bend angles, hole positions and weld fit-up are checked as work moves through the shop.
  • Final dimensional review. Critical dimensions are re-measured after welding and finishing, when heat and dressing can move a part.

What we measure

Dimensional tolerance±0.2mm on laser-cut profiles, ±0.5° on programmed bends
Weld qualityVisual inspection of size, penetration and dressing on every joint
Surface finishPainted, polished or linished finishes checked for coverage and adhesion
Edge qualityBurr-free edges as standard; deburred and linished where specified
DocumentationMill certificates, photographs and packing lists on request

Rework before dispatch

If a part does not meet the drawing, it is remade or rectified in the workshop. Rework is done in the workshop before dispatch.

Weld standards

Welding is carried out by experienced tradespeople using MIG and TIG processes, with procedure-appropriate preparation and consumables. Welds are inspected for size, penetration, undercut and appearance, and dressed where the finish specification requires it. For structural work, fit-up is checked on a jig before welding begins.

Finishing checks

Painted work is checked for coverage, film build and adhesion. Polished and linished work is checked under light for consistent grain and the absence of deep scratches. Parts are packed only after the finish is signed off, and packed to prevent transport damage.

Talk to us about tolerances

Not sure what tolerance your job needs? Tell us how the part is used and we will advise.

Request a Quote

Common questions

Yes. Mill certificates are kept with the job file and supplied on request — standard for structural, food-grade and mining work.

It is remade or rectified in the workshop before dispatch.

Yes, where the contract calls for it. Dimensional checks and weld inspection records can be provided with the delivery.