A factory needed a mezzanine support frame to carry a new storage platform — fabricated off-site, delivered through a working plant, and bolted into place over a weekend.

The challenge
The frame had to be square and twist-free or the platform would not bolt down. It also had to be transported through narrow doorways, so it could not be welded as one piece. The existing slab had level variations that had to be taken up in the baseplates.
The solution
We broke the frame into transportable sections with bolted splices, jigged each section for square, and checked the assembly for twist before welding. Baseplates were detailed with levelling allowance, and the bolt pattern was checked against the engineer’s drawing before paint.

The result
The sections bolted together on site over the weekend, the platform landed level, and the frame passed the engineer’s inspection without a single shimmed connection.
Key decisions that made it work
- Broke the frame into transportable modules with bolted splices, so it could pass through the plant doorways.
- Jigged each module for square and checked the assembly for twist before welding.
- Detailed baseplates with levelling allowance for the uneven slab.
Planning a similar job?
- Confirm the transport route before designing the module split.
- Work to the engineer’s drawing and flag conflicts before cutting.
- Ask for a trial bolt-up in the workshop; it finds problems before site installation.